Büyükçekmece Solid Waste Facility

Industrial and Infrastructure Facilities · Büyükçekmece, Istanbul

Büyükçekmece Solid Waste Facility

Developed in Büyükçekmece, this solid waste facility is an engineering project for the region’s waste management infrastructure.

Project Facts

Location
Büyükçekmece, Istanbul
Building type
Industrial and Infrastructure Facilities
Engineering
Sönmez Mühendislik

Project

About Büyükçekmece Solid Waste Facility

Developed in Büyükçekmece, this solid waste facility is an engineering project for the region’s waste management infrastructure.

Solid waste centres are critical infrastructure serving a fast-growing city's waste management needs. Long-span halls with heavy plant in constant use, industrial ventilation for odour control and separate collection of leachate are the project's key engineering topics.

Büyükçekmece Solid Waste Facility is one of the reference projects in Sönmez Mühendislik's industrial and commercial buildings portfolio. Since 1995, Sönmez Mühendislik has provided structural, electrical, mechanical and infrastructure engineering with BIM coordination for projects in Türkiye and abroad.

Approach

Engineering for solid waste facilities

Solid waste centres are industrial infrastructure facilities with heavy plant, long-span halls and corrosive environments, requiring odour and leachate control.

  • Long-span steel or reinforced concrete halls
  • Odour control and industrial ventilation
  • Leachate, drainage and infrastructure systems
  • Equipment power, lighting and fire protection

Engineering

Key engineering topics for this type of project

In waste facilities the building must last under heavy traffic, chemical exposure and continuous operation. Material selection, ventilation and drainage design are therefore decisive.

  1. 01

    Durable structure

    Concrete class, cover and coatings are selected for heavy vehicle loads and a corrosive environment.

  2. 02

    Odour and air control

    Controlled exhaust and, where needed, odour treatment are planned for reception and sorting areas.

  3. 03

    Leachate and drainage

    Water from the waste is collected separately and sent for treatment, kept apart from site drainage.

  4. 04

    Fire risk

    Early detection and suitable suppression systems are designed for waste storage areas.

FAQ

Frequently asked questions

How is odour controlled in solid waste facilities?

Enclosed areas are kept under negative pressure and exhaust air is treated, for example by biofilters, before discharge.

Why do these facilities need special drainage?

Leachate from waste is polluting; it must be collected separately from rainwater and treated.

How is fire risk reduced in waste facilities?

Early detection, thermal cameras and suppression systems of suitable capacity are used in storage areas.

Related

Related services

Planning a similar project?

Share the type and size of your project; we will plan the structural, electrical, mechanical and BIM scope together and send you our proposal.