BIM and LOD 400: solving site surprises at the desk

Short answer: BIM coordination means combining structural, electrical and mechanical models into one federated model and resolving clashes before construction. LOD 400 is the level where elements are modelled with fabrication and installation information, precise enough for the site team to fabricate directly.

Discovering on site that a duct hits a beam costs many times more than fixing it at the desk: demolition, re-fabrication, delay and disputes between trades. At Sönmez Mühendislik we model our projects in Revit at LOD 400 and coordinate all disciplines in Navisworks.

Why is BIM different from 2D drawings?

In BIM a pipe is not just a line; it is an object with a diameter, material, system and elevation. Plans, sections, quantities and schedules come from the same model, and a change updates every sheet automatically.

What does LOD 400 mean?

LevelContentUse
LOD 200–300General size and locationDesign and construction documents
LOD 350Including connections and supportsMulti-discipline coordination
LOD 400Fabrication and installation detailSite fabrication and installation

The coordination process

ModellingRevit, shared templateFederationNavisworksClash testAutomatic reportsResolutionAssigned to ownerSiteApproved model
Figure 1 — Steps of the BIM coordination process.
  • Less demolition and re-fabrication on site.
  • Ceiling heights and service routes are fixed early.
  • More accurate quantities and smaller budget deviations.
  • Contractor and client decide by looking at the same model.

Multi-discipline work from one office

Running structural, electrical and mechanical design in the same office, with shared templates and weekly coordination meetings, removes the time lost exchanging files between separate firms.

See our Services page for details of Sönmez Mühendislik's services, and our Blog for more technical articles.

Frequently asked questions

Click a question to see the answer.

Kurtköy Technopark — 100,000 m²
CostDoes BIM make a project more expensive?
It takes more effort during design, but it usually lowers total project cost thanks to the errors and delays it prevents on site.
LevelIs LOD 400 needed on every project?
No. LOD 300 may be enough for simple buildings. LOD 400 pays off on services-dense, tight or fast-track projects.
ConversionCan existing 2D projects be converted to BIM?
Yes. A model is built from the existing drawings and, if needed, site surveys, and coordination runs on that model.
Kurtköy Technopark — 100,000 m²
SoftwareWhich software do you use?
Revit for modelling and Navisworks for federation and clash detection.

Let us verify your project before it reaches the site.