BIM for facility management: what are COBie and digital handover?

Short answer: BIM for facility management means handing over the model created during design and construction as an information source for the operation phase. The handover includes not only drawings but also equipment make, model, serial number, warranty and maintenance data. This data is usually delivered in COBie format and imported into facility management software for maintenance planning, fault tracking and space management.

Most of a building's cost is in operation

Most of the money spent over a building's life is spent after construction, during operation and maintenance. Yet in many buildings handover documents are drawings and catalogues scattered across folders. Finding a valve, an air handling unit's warranty period or the circuits fed by a switchboard can take hours. BIM-based digital handover collects this information in one searchable structure.

From project model to asset model

In the ISO 19650 approach, the model created during design and construction is the project information model (PIM), and the model handed over to operations is the asset information model (AIM). ISO 19650-3 covers information management during operation. For a smooth transition, the client's information requirements and formats must be defined at the very start, in the BIM Execution Plan.

RequirementsClient information needsDesignParameter standardConstructionProduct data entryHandoverAs-built + COBieOperationFM software
Figure 1 — Information flow from design to operation.

What is COBie?

COBie (Construction Operations Building information exchange) is an international data format for passing building and equipment information to operations. It is usually delivered as a spreadsheet and can be imported directly into facility management software.

COBie sheetContentExample
Facility / Floor / SpaceBuilding, floors and roomsLevel 3 — Room 3.14 Meeting Room
TypeEquipment types and shared dataAHU type, manufacturer, warranty period
ComponentIndividual equipmentAHU-03, serial number, installation date
SystemSystems equipment belongs toChilled water system, emergency lighting
Job / SpareMaintenance tasks and spare partsFilter replacement every 3 months

What must be done in the model?

  • Parameters needed for operation are defined in Revit families from the start.
  • Room, system and equipment naming follows one standard.
  • Data of the products actually installed is entered during construction, and the model is updated to as-built.
  • Data completeness and accuracy are checked before handover.

Benefits for operations

An operations team with a digital handover sees equipment locations in the model, generates maintenance schedules automatically, tracks warranties and quickly identifies areas affected by a fault. Refurbishment projects can also start directly from an up-to-date model without re-surveying.

See our Services page for details of Sönmez Mühendislik's services, and our Blog for more technical articles.

Frequently asked questions

Click a question to see the answer.

Kurtköy Technopark — 100,000 m²
BasicsIs COBie mandatory?
There is no general requirement in Türkiye, but some international clients and institutions require COBie or a similar digital handover in their contracts.
TimingWhen should digital handover be planned?
At the start of the project. If information needs are not defined before design, data must be collected later at higher cost.
ModelCan the design model be handed straight to operations?
Not on its own. It must be updated with installed product data and stripped of detail operations do not need.
Kurtköy Technopark — 100,000 m²
SoftwareWhich FM software does it work with?
COBie is an open format and works with many facility management and maintenance tools that can import it.
ExistingCan it be done for existing buildings?
Yes. An existing-conditions model is built with laser scanning and surveys, and the equipment inventory is added to it.
BenefitWhat is the biggest benefit?
Time saved in maintenance and fault management, and building knowledge that belongs to the system rather than to individuals.

Let us plan your building's digital handover from the start.